Select your language

Wiener Linien

 

The Vienna public transport organisation ("Wiener Linien") is obliged to provide the data of subterranean structures of the underground to the central cadastre of pipework ("Zentraler Leitungskataster" - ZLK). UVM Systems has been commissioned with implementation since 2011. To ensure that this data processing is also beneficial to Wiener Linien itself, a 3D modeling of all underground structures from the available planning documents took place at the same time. There are now georeferenced 3D models representing the massive load-bearing components of all subterranean underground structures. These 3D models are kept up-to-date in line with various construction measures and will be available as 3D geo base data in the digital infrastructure database of Wiener Linien. For the use in the framework of the ZLK, 2D outlines can also be derived from the 3D models. Using the CityGRID® system, the underground models can be managed and used together with the 3D city model.

PinionProject Parameters

logo Wiener Linien
  • Evaluation: according to available building plans of the Wiener Linien
  • Detail: supporting components, also in the interior
  • Project start: 2011
  • Scope: 79km, 5 lines
 
 

Underground Vienna

 
  top of page 
 
  • News and Events

     

    CityGRID® 2025 Release

    CityGRID® Version 2025, Build 19.10.098 (Hotfix), has been published!

     

    Download

    Change list

     
  • New Video

    From drone flight to finished building model - possible with CityGRID!

     

    Watch Video

    LinkedIn

     
  • 3D Forum Lindau 2025

    Visit our workshop "3D building modeling from drone images" at the 3D Forum Lindau 2025:

     

    3D Forum Lindau